Luminous flux
Bracket maintained illuminance before selecting a nominal lumen package.
- 2,000–4,000 lm for smaller occupied zones
- 4,000–8,000 lm for larger commercial bays
- 12,000 lm and above for high mounting
Four filters, one defensible shortlist
Organize commercial luminaires by luminous flux, mounting method, IP rating and dimming interface. The dashboard is a screening tool: final selection still depends on the exact photometric file, thermal conditions and project approvals.

Bracket maintained illuminance before selecting a nominal lumen package.
Match the ceiling or structure before comparing appearance.
Use the installed exposure and cleaning procedure to set the boundary.
Coordinate the luminaire with the control narrative and commissioning scope.
A product name alone is not enough to reproduce a lighting result. Keep each file and parameter tied to the exact configuration under review.
Record task-plane illuminance, visual-comfort objective and operating schedule.
Confirm aperture, ceiling system, suspension or structural attachment.
Set IP, ambient temperature, impact and cleaning requirements.
Name the interface, zoning method, sensor behavior and emergency sequence.
Run the exact photometric distribution with documented project assumptions.
We will organize the inputs into a reviewable commercial-lighting shortlist.
Request Quick Select review